hit counter script

Chapter 2 Installing The Server - Cisco UCS C3160 Installation And Service Manual

Hide thumbs Also See for UCS C3160:
Table of Contents

Advertisement

Unpacking and Inspecting the Server
Unpacking and Inspecting the Server
Caution
When handling internal server components, wear an ESD strap and handle modules by the carrier edges
only.
Note
The chassis is thoroughly inspected before shipment. If any damage occurred during transportation or
any items are missing, contact your customer service representative immediately.
Step 1
Remove the system from its cardboard container and save all packaging material.
Step 2
Compare the shipment to the equipment list provided by your customer service representative. Verify
that you have all items.
Check for damage and report any discrepancies or damage to your customer service representative. Have
Step 3
the following information ready:
Preparing for Server Installation
This section provides information about preparing for server installation, and it includes the following
topics:
Installation Guidelines
To prevent the system from overheating, do not operate it in an area that exceeds the maximum
Warning
recommended ambient temperature of: 35° C (95° F).
Statement 1047
Warning
The plug-socket combination must be accessible at all times, because it serves as the main
disconnecting device.
Statement 1019
Cisco UCS C3160 Rack Server Installation and Service Guide
2-2
Invoice number of shipper (see the packing slip)
Model and serial number of the damaged unit
Description of damage
Effect of damage on the installation
Installation Guidelines, page 2-2
Rack Requirements, page 2-4
Equipment Requirements, page 2-4
Slide Rail Adjustment Range, page 2-4
Chapter 2
Installing the Server
OL-32062-01

Advertisement

Table of Contents
loading

Table of Contents