hit counter script

Mounting Bolt Location - LG LS091HSV3 Installation Manual

Single zone high efficiency, standard, extended pipe, and mega wall mounted
Hide thumbs Also See for LS091HSV3:
Table of Contents

Advertisement

General Mounting
Securely attach the outdoor unit to a condenser pad, base rails, or
another mounting platform that is securely anchored to the ground or
building structure. Attach the outdoor unit with a bolt and nut on a con-
crete or rigid mount. See Figure 3. Follow applicable local codes for
clearance, mounting, anchor and vibration attenuation requirements.
All referenced materials are to be eld-supplied. Images are not to scale.
Mounting Platform
The underlying structure or foundation must be designed to support
the weight of the unit. Avoid placing the unit in a low lying area
where water may accumulate. When installing the outdoor unit on
the wall or roof top, anchor the mounting base securely to account
for wind, earthquakes or vibration.
Tie-Downs and Wind Restraints
The strength of the Single Zone system frame is adequate to
be used with field-provided wind restraint tie-downs. The overall
tie-down configuration must be approved by a local professional
engineer.
Always refer to local code when designing a wind restraint system.
Snow and Ice Conditions
In climates that experience snow build-up, place the unit on a raised platform to ensure condenser airflow. The raised support platform must
be high enough to allow the unit to remain above possible snow drifts. Mount the unit on a field-provided snow stand at a minimum height
that is equal to the average annual snowfall plus 20 inches. Design the mounting base to prevent snow accumulation on the platform in front
or back of the unit case. If necessary, provide a field fabricated hood to keep snow and ice and/or drifting snow from accumulating on the coil
surfaces. Use inlet and discharge duct or hoods to prevent snow or rain from accumulating on the fan inlet and outlet guards. Best practice
prevents snow from accumulating on top of the unit. Consider tie-down requirements in case of high winds or where required by local codes.
When deciding on a location to place the outdoor unit, be sure to choose an area where run-off from defrost will not accumulate and freeze on
sidewalks or driveways which may create unsafe conditions.
Proper airflow through the Single Zone outdoor unit coil is critical for correct unit operation. When installing, consider service, inlet and outlet,
and minimum allowable space requirements as illustrated in the diagrams to follow.
Minimum Clearance Requirements for Single Zone Systems
Outdoor Unit Clearance
Specific clearance requirements in the diagrams on the next page are for the single zone wall mount systems. Figure 4 shows the overall
minimum clearances that must be observed for safe operation and adequate airflow around the outdoor unit.
When placing the outdoor unit under an overhang, awning, sunroof or other "roof-like structure, observe the clearance requirements (as shown
in Figure 5) for height in relation to the unit. This clearance ensures that heat radiation from the condenser is not restricted around the unit. See
Figures 6 and 7 for recommendations when other obstacles are present.
Adhere to all clearance requirements if installing the unit on a roof. Be sure to level the unit and ensure that the unit is adequately anchored.
Consult local codes for rooftop mounting requirements.
GENERAL INSTALLATION GUIDELINES
Due to our policy of continuous product innovation, some specifications may change without notification.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. "LG" is a registered trademark of LG Corp.
Figure 3: Outdoor Unit Mounting Methods
Bolt
Placement
& Anti-Vibration
Pad
Foundation

Mounting Bolt Location

Top of Unit
Piping Connection
19

Advertisement

Table of Contents
loading

Table of Contents