Table 5. N6210 electrical requirements–one controller node, with one 256-GB Flash Cache
module (continued)
100 to 120V
Worst-
case,
single
Input voltage
PSU
Input power
421
measured, W
Thermal
1,437
dissipation,
BTU/hr
Input power
50 to 60
frequency, Hz
Table 6. N6210 electrical requirements–two controller nodes, with one 256-GB Flash Cache
module per node
100 to 120V
Worst-
case,
single
Input voltage
PSU
Input current
6.27
measured, A
Input power
626
measured, W
Thermal
2,137
dissipation,
BTU/hr
Input power
50 to 60
frequency, Hz
Table 7. N6220 electrical requirements–one controller node, with one 512-GB Flash Cache
or Flash Cache 2 module
100 to 120V
Worst-
case,
single
Input voltage
PSU
Input current
4.31
measured, A
Input power
431
measured, W
Thermal
1,437
dissipation,
BTU/hr
Input power
50 to 60
frequency, Hz
200 to 240V
Worst-
Typical
case,
System,
single
Per PSU
two PSUs
PSU
150
299
411
511
1,021
1,403
200 to 240V
Worst-
Typical
case,
System,
single
Per PSU
two PSUs
PSU
2.32
4.64
3.11
231
462
612
789
1,577
2089
200 to 240V
Worst-
Typical
case,
System,
single
Per PSU
two PSUs
PSU
1.55
3.09
2.41
155
309
421
511
1,021
1,403
Typical
System,
Per PSU
two PSUs
147
293
500
1,000
Typical
System,
Per PSU
two PSUs
1.19
2.38
225
450
768
1,536
Typical
System,
Per PSU
two PSUs
0.87
1.73
152
303
500
1,000
Preparing for the installation
7