hit counter script

Verifying Package Contents - Cisco Catalyst 3560 Hardware Installation Manual

Hide thumbs Also See for Catalyst 3560:
Table of Contents

Advertisement

Preparing for Installation

Verifying Package Contents

Note
Catalyst 3560 Switch Hardware Installation Guide
3-10
Airflow around the switch and through the vents is unrestricted.
Temperature around the unit does not exceed 113°F (45°C).
If the switch is installed in a closed or multirack assembly, the
Note
temperature around it might be greater than normal room temperature.
Carefully remove the contents from the shipping container, and check each item
for damage. If any item is missing or damaged, contact your Cisco representative
or reseller for support. Return all packing material to the shipping container, and
save it.
The switch is shipped with these items:
This Catalyst 3560 Switch Hardware Installation Guide
Where to Find the Catalyst 3560 Documentation flyer
AC power cord (AC-powered switches)
One RJ-45-to-DB-9 adapter cable
Mounting kit containing:
Four rubber feet for mounting the switch on a table
Two 19-inch rack mounting brackets (also used for wall mounting)
Six Phillips flat-head screws for attaching the brackets to the switch
Four Phillips machine screws for attaching the brackets to a rack
One cable guide and one black Phillips machine screw for attaching the
cable guide to one of the mounting brackets
One redundant power system (RPS) connector cover (for wall mounting)
Two Phillips pan-head screws (for attaching the RPS cover)
Four Phillips truss-head screws (for wall-mounting brackets)
Chapter 3
Switch Installation
78-16057-01

Advertisement

Table of Contents
loading

Table of Contents