UPS5000-A-(60 kVA-120 kVA)-H User Manual Issue Date 2020-01-10 HUAWEI TECHNOLOGIES CO., LTD.
Page 2
Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
About This Document About This Document Purpose This document describes the high-frequency tower-mounted UPS5000-A-(60 kVA–120 kVA)- H in terms of its features, performance specifications, appearance, structure, and working principles as well as instructions for installation, operation, maintenance, and management. UPS is short for uninterruptible power system.
The "NOTICE", "CAUTION", "WARNING", and "DANGER" statements in this document do not cover all the safety instructions. They are only supplements to the safety instructions. Huawei will not be liable for any consequence caused by the violation of general safety requirements or design, production, and usage safety standards.
Do not power on the equipment before it is installed or confirmed by professionals. 1.2 Personnel Requirements Personnel who plan to install or maintain Huawei equipment must receive thorough training, understand all necessary safety precautions, and be able to correctly perform all operations.
Page 17
Metal shavings from drilling may short-circuit boards inside the equipment. Obtain the consent from the customer, subcontractor, and Huawei before drilling. Wear goggles and protective gloves when drilling holes. ...
Page 20
The site must be equipped with qualified fire extinguishing facilities, such as firefighting sands and powder fire extinguishers. To ensure battery safety and battery management accuracy, use batteries provided with the UPS by Huawei. Huawei is not responsible for any battery faults caused by batteries not provided by Huawei. Battery Installation Before installing batteries, observe the following safety precautions: ...
indicates the energy flow direction. 2.2.1 Conceptual Diagram The UPS5000-A is an online double-conversion UPS that uses digital signal processing (DSP) technology and features high efficiency and high power density. Figure 2-2 shows a conceptual diagram for the UPS.
Figure 2-7 UPS conceptual diagram in ECO mode 2.3 Product Description The UPS5000-A is tower-mounted, and provides optional components such as a battery bus bar box (BBB box), battery circuit breaker box (BCB box), dry contact card, antiseismic kit, parallel cable, and BSC cable.
UPS5000-A-(60 kVA-120 kVA)-H User Manual 2 Overview Figure 2-8 UPS5000-A-60 kVA/120 kVA (1) Front panel 1 (2) MDU (3) Front panel 2 (4) Leveling foot (5) Castor (6) Chassis 2.3.2 Product Structure The UPS functional components include the power input and output terminals, communications slots, basic dry contacts, and monitoring bus that controls the expansion of optional components and monitors UPSs.
Page 29
UPS5000-A-(60 kVA-120 kVA)-H User Manual 2 Overview Figure 2-9 UPS5000-A-60 kVA/ 120 kVA structure (front view) (1) Bypass unit indicators (2) MDU port (3) Bypass unit ready switch (4) MDU reset button (5) DIP switch (6) Power unit indicators (7) Power unit ready...
Page 30
UPS5000-A-(60 kVA-120 kVA)-H User Manual 2 Overview Figure 2-10 UPS5000-A-60 kVA/120 kVA structure (rear view and enlarged view of certain parts) (1) Dry (2) Battery (3) Port for an ambient (4) FE port (upper) contacts temperature temperature and humidity sensor...
Status 8 Reserved 2.3.3 Control Port The UPS5000-A provides a communications slot, a fast Ethernet (FE) port, an RS485 port, parallel ports, a BSC port, basic dry contacts, and other control signal ports. Parallel Port and BSC Port To connect UPSs in parallel, use a parallel cable to connect the parallel ports on the ECMs on the two UPSs.
LCD or WebUI. 2.4.1 Single UPS The UPS5000-A is a high frequency tower-mounted UPS. It uses a unit-level design to handle power functionality, and provides an embedded maintenance bypass switch to ensure maintenance with power on.
User Manual 2 Overview Figure 2-14 Conceptual diagram of a dual-bus system 2.5 Optional Components The UPS5000-A provides a variety of optional components to address various customer requirements. Table 2-10 describes the optional components. Table 2-10 Optional components of the UPS5000-A...
Page 43
UPS5000-A-(60 kVA-120 kVA)-H User Manual 3 Installation Figure 3-1 Installation dimensions of the UPS5000-A-60 kVA/120 kVA (unit: mm) Installation Environment Do not install the UPS in high temperature, low temperature, and damp areas. Install the UPS far away from water sources, heat sources, and inflammable or explosive materials.
Page 49
UPS5000-A-(60 kVA-120 kVA)-H User Manual 3 Installation Figure 3-3 DT terminal for the UPS5000-A Table 3-5 DT terminal specifications for the UPS5000-A Nomin Bolt ΦH d (mm) D (mm) W (mm) L (mm) (mm) Nominal Devi Nominal Devi Reference Nominal...
Page 52
Check that the fittings comply with the packing list. If some fittings are missing or do not comply with the packing list, record the information and contact your local Huawei office immediately. Step 7 After checking that the equipment is intact, remove the UPS front panels, as shown in Removing UPS front panels.
Page 78
UPS5000-A-(60 kVA-120 kVA)-H User Manual 3 Installation Huawei does not provide the EPO switch or cable. Prepare them by yourself. The recommended cable is 22 AWG. Equip the EPO switch with a protective cover to prevent misoperations, and cover the cable with protective tubing.
Procedure Step 1 Close the upstream bypass and mains input switches. After the UPS is powered on, initialization begins. The MDU displays the Huawei logo and an initialization progress bar. Step 2 After the LCD starts properly, perform the following operations: ...
Page 140
UPS (when no battery string is shared). High or low charging power shortens the battery lifespan, or even promptly damages batteries. To determine the battery capacity, contact Huawei technical support.
Step 4 Press and hold down the BATT START button on the bypass unit for at least 2 seconds. The system automatically enters the battery cold start status. The LCD displays the Huawei logo and an initialization progress bar.
EOD voltage and 11.3 V/cell. For details about how to rectify common faults, see Table 7-1. If any unmentioned faults occur, see the alarm list chapter, or contact Huawei technical support. Table 7-1 Solutions to common faults Case Symptom...