Verifying Your Installation
Verifying Your Installation
You can verify that you have correctly installed the router by checking the
following LEDs:
Optional Installation Steps
This section describes the following installation steps that you might or might not
use, depending on your site and how you are configuring the router:
Cisco 1750 Router Hardware Installation Guide
x
PWR (front panel)—On when power is being supplied to the router.
•
•
OK (front panel)—On when the router software is loaded and functional.
Blinking means that the router is performing a power-on self-test (POST).
ETH ACT (front panel)—Blinking when there is network traffic on the local
•
Ethernet LAN.
SLOTØ, SLOT1, and SLOT2 (front panel)—Activity on PORTØ and PORT1
•
of each of these slots varies, depending on the type of WIC or VIC installed.
Refer to Table 4 in the "Cisco 1750 Router Overview" chapter for detailed
information on activity at different ports.
SLOT 0 and SLOT 1 OK (rear panel)—On when a WIC or VIC is correctly
•
installed in the slot.
SLOT 2 OK (rear panel)—On when a VIC is correctly installed in the slot.
•
LINK (rear panel)—On when the router is correctly connected to the local
•
Ethernet LAN through the 10/100-Mbps Ethernet port.
Connecting a PC
•
•
Connecting a Modem
Wall-Mounting
•
78-6169-02