hit counter script

Advertisement

TABLE OF CONTENTS

1 Safety Precautions----------------------------------------------- 2
2 Specifications ----------------------------------------------------- 3
3 Installation Instructions ---------------------------------------- 4
4 Operating Instructions------------------------------------------ 6
5 Troubleshooting Guide ----------------------------------------- 9
7 Wiring Connection Diagram ---------------------------------21
8 Schematic Diagram ---------------------------------------------23
Model No.
Chassis
Product Color Silver
Destination
PAGE
© Panasonic Corporation 2012 Unauthorized copy-
ing and distribution is a violation of law.
Order Number KAD1209001CE
TOASTER OVEN
NB-G110PLVA
USA
E5
PAGE

Advertisement

Table of Contents
loading

Summary of Contents for Panasonic NB-G110PLVA

  • Page 1: Table Of Contents

    5 Troubleshooting Guide ----------------------------------------- 9 6 Disassembly and Assembly Instructions ---------------14 7 Wiring Connection Diagram ---------------------------------21 8 Schematic Diagram ---------------------------------------------23 9 Exploded View and Replacement Parts List -----------24 © Panasonic Corporation 2012 Unauthorized copy- ing and distribution is a violation of law.
  • Page 2: Safety Precautions

    1 Safety Precautions...
  • Page 3: Specifications

    2 Specifications...
  • Page 4: Installation Instructions

    3 Installation Instructions...
  • Page 6: Operating Instructions

    4 Operating Instructions...
  • Page 9: Troubleshooting Guide

    5 Troubleshooting Guide Before starting the troubleshooting, check the action of the oven according to the operation check tests 1 & 2 below. 1. Operation check test for the P.C. board 2. Operation check test for the heater and thermistor 5.1.
  • Page 10 5.2. Operation check test for the P.C. board (Do not turn on the power of the heater during the check test.) • Set the power button to “ON”. • Connect the power cord to the 120V.a.c. with the temperature key “ (up)”...
  • Page 11 Operation Working description Items to be checked Display and buzzer information Action • Press the "Pizza / Frozen" key. • The power lamp comes on. • The buzzer sounds once when the key is operated. • The "Pizza / Frozen" lamp comes •...
  • Page 12 5.3. Operation check test for the heater and thermistor The precondition for this test is to set the baked color to "Medium". Operation Working description Items to be checked Display and buzzer information Action • Connect the power cord to the •...
  • Page 13 5.5. Checking Points The points to checking the thermistors in the upper and lower heaters are indicated below.
  • Page 14: Disassembly And Assembly Instructions

    6 Disassembly and Assembly Instructions Important: • Refer to the tips on assembly, and carry out the disassembly procedure backward to assembly. • Remove the bread pan assy and kneading blade B unit before disassembling. Notes: • Before disassembling the unit, remove the crumb tray, net assy., and drip pan. •...
  • Page 15 6.3. Disassembling the back plate assy. 1. Remove the 4 screws A and remove the back plate assy. in the direction indicated by the arrow. 6.4. Disassembling the outer plate assy. 1. Pull out the 4 leg rubbers. 2. Remove the 2 screws C and remove the front leg. 3.
  • Page 16 The point in reassembly Reinstall the front plate by inserting the tabs (at right and left sides) to the step mark. 6.6. Disassembling the upper heater assy. and the lower heater assy. Disassembling the upper heater assy. 1. Remove the 2 screws E. 2.
  • Page 17 6.7. Disassembling the algon heater assy. 1. Remove the 2 screws E. 2. Remove the fasten terminal (CN3: red and CN7: white) from the P.C. board unit. 3. Roll out the tab locking the algon heater assy. with a pair of small pliers. 4.
  • Page 18 6.8. Disassembling the thermistor assy. 1. Remove the fasten terminal (CN4: blue) from the P.C. board unit. 2. Cut the band. 3. Remove the screw A. 4. Remove the insulation plate and thermistor assy. 6.9. Disassembling the P.C. board unit 1.
  • Page 19 6.10. Disassembling the door assy. 6.10.1. DOOR 1. Remove the 2 screws. 2. Remove the door assy. 6.10.2. DOOR HANDLE 1. Remove the 2 screws D. 2. Remove the door handle. 3. Insert the thin screwdriver between the window holder A and window holder B, and remove the 2 tabs.
  • Page 20 6.10.3.1. Points in reassembly WINDOW HOLDER A&B GLASS A&DOOR HONDLE 1. Insert the 2 holders on the window holder A into the holes 1. Adjust the clearance between the window holder plate B on the window holder B assy. to install the window holder and glass A, and install the door handle.
  • Page 21: Wiring Connection Diagram

    7 Wiring Connection Diagram 7.1. BASIC WIRING DIAGRAM...
  • Page 22 7.2. Wiring Commection Diagram...
  • Page 23: Schematic Diagram

    8 Schematic Diagram 8.1. SCHEMATIC DIARAM...
  • Page 24: Exploded View And Replacement Parts List

    9 Exploded View and Replacement Parts List 9.1. PARTS LOCATION...
  • Page 25 9.2. REPLACEMENT PARTS LIST Notes:Important safety notice • Components identified by mark have special characteristics important for safety. • " When replacing any of these components use only manufacturer's specified parts." MODEL No.NB-G110P Pcs/Set Safety Ref. No. Part No. Part Name & Description Remarks G110P <PARTS LIST>...
  • Page 26 Pcs/Set Safety Ref. No. Part No. Part Name & Description Remarks G110P ABZ41-159 Net support B ABZ06-135 Pad A ABZ07-135 Pad B...
  • Page 27 9.3. PACKING INSTRUCTION...

Table of Contents