hit counter script

Cisco UCS C260 Installation And Service Manual page 72

Table of Contents

Advertisement

Installing or Replacing Server Components
Step 2
Install a new I/O riser:
a.
Align the new I/O riser with its empty designated socket on the motherboard. See
Note
b.
Push down evenly on both ends of the I/O riser until it is fully seated in its motherboard socket.
c.
Ensure that the I/O riser rear panel tab sits flat against the chassis rear panel opening.
Install the single screw that secures the I/O riser to the chassis.
d.
Replace the top cover.
e.
Replace the server in the rack, replace cables, and then power on the server by pressing the Power
f.
button.
Figure 3-23
1
I/O riser in designated motherboard socket
Cisco UCS C260 Server Installation and Service Guide
3-38
You must install the I/O riser in its designated motherboard socket.
Removing and Replacing an I/O Riser
Chapter 3
2
I/O riser securing screw
Maintaining the Server
Figure
3-23.
1
2
OL-24342-01

Advertisement

Table of Contents
loading

Table of Contents