Planning a Switch Stack
–
–
–
Access to the switch rear panel and to the rear of the rack.
•
Catalyst 2960-S Switch Hardware Installation Guide
2-6
CAB-STK-E-0.5M= (0.5-meter cable)
CAB-STK-E-1M= (1-meter cable)
CAB-STK-E-3M= (3-meter cable)
Chapter 2
Switch Installation
OL-19732-04