Replacing the operator information panel assembly
To install the replacement operator information panel assembly, complete the
following steps.
1. Press the ferrite core into place.
2. Connect the light path diagnostics ribbon cable and front USB cable to the I/O
3. Slide the front of the operator information panel assembly into the opening in
4. Insert the tabs into the guide slots on the operator information panel assembly;
5. Connect the light path diagnostics ribbon cable and front USB cable to the I/O
6. Install the top cover, front cover (tower model only), and bezel (see "Replacing
7. Connect the cables and power cords (see "Connecting the cables" on page 116
8. Turn on all attached devices and the server.
130
IBM System x3800 Type 8866: Problem Determination and Service Guide
board.
the chassis.
then, push the assembly toward the front of the server until it stops.
Note: To install the operator information panel assembly in the tower position
the tabs must be inserted into the middle and rear guide slots. To install the
operator information panel assembly in the rack position the tabs must inserted
into the front and middle guide slots. When the assembly is in position, "RACK"
or "TOWER" will be visible through the opening at the rear of the assembly.
board.
the top cover, bezel, and front cover" on page 119).
for cabling instructions).
Tabs
Retention tab