Operation sequence

Maintenance to VFD

Check all the enclosures of drive and bypass unit are properly closed and VFD is
ready for operation
Unlock the mode selection switch
Set the mode selection switch to "Unlock position"
Close QS1
Close QS2
Set the mode selection switch to "Working position"
Lock the mode selection switch
Close QF1.

Maintenance to Bypass

Check all the enclosures of bypass unit are properly closed and ready for operation
Unlock the mode selection switch
Set the mode selection switch to "Unlock position"
Close QS3
Set the mode selection switch to "Working position"
Lock the mode selection switch
Close QF1.

VFD to Bypass

Open QF1
Unlock the mode selection switch
Set the mode selection switch to "Unlock position"
Open QS2
Open QS1
Wait for at least 3 x rotor time constant (if not available, wait for longer than 5s)
Close QS3
Set the switch to "Working position"
Lock the mode selection switch
Close QF1.