hit counter script

LG LS240HEV2 Installation Manual page 55

Single zone mega, standard efficiency, and mega 115v wall mounted
Hide thumbs Also See for LS240HEV2:
Table of Contents

Advertisement

Cable Installation When Piping is on the Left Side:
• Insert the communication / connection (power) cable through the
bottom of the indoor unit,
• Connect the terminals to the terminal block.
• Secure the cable onto the terminal block with the cable retainer.
• Secure the refrigerant piping, drain hose, and communication /
connection (power) cable together using cable ties and conduit, or
by the bundling method.
• Each wire must be securely attached to the terminal block.
• Ground cable must be longer than the other wires.
• Secure the cable onto the control board using a cable tie.
• Use a conduit to protect the cable / refrigerant piping from the
indoor unit to the outdoor unit.
Cable Installation When Piping is on the Right Side:
• Connect the terminals to the terminal block.
• Secure the cable onto the terminal block with the cable retainer.
• Secure the refrigerant piping, drain hose, and communication /
connection (power) cable together using cable ties and conduit, or
by the bundling method.
Position the drain hose at the bottom. Positioning the drain hose at the
top of the bundle can cause condensate to overflow from the drain pan
in the inside of the indoor unit.
For more information on conduits or the bundling method, see the
Refrigerant Piping Connection section.
8. Reattach the metal control cover using the screw (if applica-
ble).
LS090-120HEV2, LS090-120HFV3 and LS090-120HXV2 indoor units and outdoor units have similar frames; however,
LS090-120HEV2 and LS090-120HFV3 systems require 208-230V, 60Hz, 1ph power supply. LS090-120HXV2 systems require
115V, 60Hz, 1ph power supply. Verify which system is being installed. An incorrect power supply will result in electric shock,
fire, physical injury, or death.
ELECTRICAL SYSTEM INSTALLATION
Due to our policy of continuous product innovation, some specifications may change without notification.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. "LG" is a registered trademark of LG Corp.
Indoor Unit Electrical Connections
Figure 95: Cable / Refrigerant Piping / Drain Hose Installation Options.
Wiring When Piping is on the Left Side
1(L1) 2(L2) 3
Wiring When Piping is on the Right Side
1(L1) 2(L2) 3
Slide the Metal Plate
Cover Up
Terminal Block
Connection Cable
Cable Clamp
Slide the Metal Plate
Cover Up
Terminal Block
Connection Cable
Cable Clamp
55

Advertisement

Table of Contents
loading

Table of Contents