hit counter script

Toshiba MMY-SUG0801MT8P-E Installation Manual page 7

Hide thumbs Also See for MMY-SUG0801MT8P-E:
Table of Contents

Advertisement

• Use wiring that meets the specifications in the Installation
Manual and the stipulations in the local regulations and laws.
Use of wiring which does not meet the specifications may give
rise to electric shocks, electrical leakage, smoking and/or a fire.
• Check that the product is properly earthed. (grounding work)
Incomplete earthing may cause electric shock.
• Do not connect the earth line to a gas pipe, water pipe, lightning
conductor, or a telephone earth line.
• After completing the repair or relocation work, check that the
ground wires are connected properly.
• Install a circuit breaker that meets the specifications in the
Installation Manual and the stipulations in the local regulations
and laws.
• Install the circuit breaker where it can be easily accessed by the
agent.
• When installing the circuit breaker outdoors, install one which is
designed to be used outdoors.
• Under no circumstances the power cable must not be extended.
Connection trouble in the places where the cable is extended
may give rise to smoking and / or a fire.
• Electrical wiring work shall be conducted according to law and
regulation in the community and Installation Manual.
Failure to do so may result in electrocution or short circuit.
• Do not supply power from the power terminal block equipped on
the outdoor unit to another outdoor unit. Capacity overflow may
occur on the terminal block and may result in fire.
• When carrying out electric connection, use the wire specified in
the Installation Manual and connect and fix the wires securely to
prevent them applying external force to the terminals. Improper
connection or fixing may result in fire.
11-EN
Test run
• Before operating the air conditioner after having completed the
work, check that the electrical parts box cover of the indoor unit
and service panel of the outdoor unit are closed, and set the
circuit breaker to the ON position. You may receive an electric
shock if the power is turned on without first conducting these
checks.
• When you have noticed that some kind of trouble (such as
when an error display has appeared, there is a smell of burning,
abnormal sounds are heard, the air conditioner fails to cool or
heat or water is leaking) has occurred in the air conditioner, do
not touch the air conditioner yourself but set the circuit breaker to
the OFF position, and contact a qualified service person.
Take steps to ensure that the power will not be turned on
(by marking "out of service" near the circuit breaker, for instance)
until qualified service person arrives. Continuing to use the
air conditioner in the trouble status may cause mechanical
problems to escalate or result in electric shocks or other failure.
• After the work has finished, be sure to use an insulation tester
set (500V Megger) to check the resistance is 2MΩ or more
between the charge section and the non-charge metal section
(Earth section). If the resistance value is low, a disaster such as
a leak or electric shock is caused at user's side.
• Upon completion of the installation work, check for refrigerant
leaks and check the insulation resistance and water drainage.
Then conduct a test run to check that the air conditioner is
operating properly.
Explanations given to user
• Upon completion of the installation work, tell the user where the
circuit breaker is located. If the user does not know where the
circuit breaker is, he or she will not be able to turn it off in the
event that trouble has occurred in the air conditioner.
– 6 –
EN
12-EN

Advertisement

Table of Contents
loading

Table of Contents