Page 1
HUAWEI NE05E,NE08E V300R006C10 and Later Versions Hardware Guide Issue Date 2023-03-31 HUAWEI TECHNOLOGIES CO., LTD.
Page 2
Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
Page 9
Hardware Guide 1 Document Declaration Document Declaration Purpose This document describes hardware features of the NE05E,NE08E. It helps intended readers obtain detailed information about each chassis, board, and cable, and learn how to install and maintain devices. NO TICE The Hardware Guide includes hardware data of multiple versions. Before using this document, check the first version supported by the hardware.
Page 14
HUAWEI NE05E,NE08E Hardware Guide 3 Hardware Description Overview Table 3-1 Basic information about the NE05E-S2 Description Part Number Model First supported version NE05E-S2 02312EWC NECM00HOST07 V300R005C00 System,DC, 2*GE/ FE(Optical),2*GE/ FE(Electric), 1*GE/ FE(Combo), 6*FE(Electric) NE05E-S2 02352NPE NECM00HOST08 V300R005C00 System,DC, 2*GE/ FE(Optical),2*GE/...
Page 15
Interface Numbering Rules On the NE05E-S2 an interface is numbered in the format of "CXP slot number/PIC number/port number". The following part describes the details: ● Logical slot number of the system control board The slot number of NE05E-S2 is always 0.
Page 17
Heat Dissipation Figure 3-4 NE05E-S2 air duct ● Heat dissipation holes of air intake and exhaust vents on NE05E-S2 must be kept clean and unblocked. ● A distance of at least 50 mm must be reserved at the air intake/exhaust vent on NE05E-S2 to ensure good ventilation.
Page 22
HUAWEI NE05E,NE08E Hardware Guide 3 Hardware Description Overview Table 3-7 Basic information about the NE05E-SQ Description Part Number Model First supported version NE05E-SQ - 2 02350WSF NECMHSTA0200 V300R001C10 channels DC entries, with 4*10GE(o), 8*10GE/GE/FE(o), 8*GE/FE(o), 8*GE/ FE(e) NE05E-SQ - 2...
Page 23
HUAWEI NE05E,NE08E Hardware Guide 3 Hardware Description Panel Table 3-8 Indicators on the NE05E-SQ Silkscreen Name Color Status Description STAT Board status green The device is indicator working normally. The device hardware is faulty. The device hardware is faulty. Alarm...
Page 25
HUAWEI NE05E,NE08E Hardware Guide 3 Hardware Description Table 3-9 Buttons on the NE05E-SQ Silkscreen Name Description There is only one RST button for resetting the device. The RST button can also be used to delete the password and configuration file on the device.
Page 30
Unspecified Unspecified Unspecified Interface Numbering Rules On the NE05E-SQ, an interface is numbered in the format of "slot number/ subcard number/port number". The following part describes the details: ● Slot number The slot number of NE05E-SQ is always 0.
Page 38
HUAWEI NE05E,NE08E Hardware Guide 3 Hardware Description Overview Table 3-20 Basic information about the NE05E-SR Description Part Number Model First supported version NE05E-SR 02351XAG NECM000AIC01 V300R003C10 System,Indoor,AC, 2*GE/FE Combo, 2*GE/FE(o),2*GE/ FE(e) NO TE In specific areas, as the auxiliary materials are different, the sales BOM numbers may be different.
Page 41
HUAWEI NE05E,NE08E Hardware Guide 3 Hardware Description Table 3-22 Buttons on the NE05E-SR Silkscreen Name Description There is only one RST button for resetting the device. The RST button can also be used to delete the password and configuration file on the device.
Page 43
Unspecified Transmit end of the Console interface Interface Numbering Rules On the NE05E-SR, an interface is numbered in the format of "slot number/subcard number/port number". The following part describes the details: ● Slot number The slot number of NE05E-SR is always 0.
Page 66
The procedure is as follows: ● For the NE05E-SQ, NE05E-SR and NE05E-S2: The RST button can also be used to delete passwords and configuration files on the device. Once you press the RST button, the device starts to reset. Then you press and hold down the RST button 35s to 45s until the SATA and ALM indicators blink green.
Page 207
Power dissipation Mode Air cooling Type of power cables 4mm^2(10m) 3.4 Fan Module The fan board exhausts hot air for heat dissipation. 3.4.1 NECD001FAN00 (NE05E-S2 FAN Unit) Overview Table 3-254 Basic information about the NECD001FAN00 Item Details Description NE05E-S2 FAN Unit...
Page 224
This section describes instructions on how to use an optical module. NO TE Only optical modules matching Huawei products can be used. These optical modules are strictly tested by Huawei. If non-matching optical modules are used, device requirements may fail to be met, and services may fail to run properly. To replace optical modules, see Parts Replacement-Replacing an Optical Module.
Page 282
Rx sensitivity (OMA) [dBm] Overload power (AVG) [dBm] -7 dBm Overload power (OMA) [dBm] NOTE The interface standard is Huawei-specific. Self-loop is not supported. An optical attenuator must be added if self-loop is required. 3.5.9.2 10Gbps-SFP+-MMF-850nm-0.1km-industry Table 3-310 10Gbps-SFP+-MMF-850nm-0.1km-industry specifications Item...
Page 322
Figure 3-78 AE 905S module (rear view) NO TE An AE 905S module must be inserted into a GE optical interface of SFP type. The AE 905S module has a STAT indicator under the HUAWEI logo. Table 1 describes STAT indicator states.
Page 415
Dimensions (mm): H x W x D NE08E: NE08E: 100×580×500 200×580×500 NE05E: Air exhaust vents are close to the top of the network cabinet and air intake vents are close to the bottom of the network cabinet. Positions of the air vents on the...
Page 436
The outer package is severely damaged. ● There is water leakage on the outer package. Find the causes and provide feedback to the local representative office of Huawei. Step 3 Observe the labels on the carton to check the equipment configuration and take a record.
Page 439
Equipment Problem Report and send it The project supervisor shall fill in the to the order management engineer of the local office of Huawei within three days. 4.1.1.3.2 Installing chassis The installation modes for chassis vary with installation environment.
Page 440
● When installing the equipment in a 19-inch open rack, a 19-inch cabinet, or an N63E cabinet, see the "NE05E, NE08E Series Quick Installation Guide (19inch, and ETSI Cabinet)". ● When installing the equipment in an IMB network cabinet, see the "NE05E and NE08E...
Page 451
Template for the Printing Template is available to print out the label. You can obtain the template by: ● Downloading the template from http://support.huawei.com. The directory of the template is Documentation > Engineering Service > Engineering Quality > Quality Standard and Template.
Page 504
● When peeling the insulation layer of a power cable, do not hurt the metal conductor of the cable. ● If the bare press-fitting terminal is not provided by Huawei, adapt the value of L1 according to the actual value L of the terminal. L1 = L + (1-2) mm.
Page 527
NO TICE Huawei engineers need to obtain the telephone number of the GTAC to contact Huawei headquarters as soon as possible when an exception or a problem that Huawei engineers cannot locate or solve temporarily occurs.
Page 528
– Prepare spare parts. NO TICE Before replacing the chassis or control board, contact Huawei engineers to see if a license is required. You can apply for a license or use Stick License to activate some license control items. –...
Page 529
NO TE The operation is considered successful only when the new parts are proved to be running normally. Otherwise, contact Huawei technical support personnel. Return and repair the faulty parts. If a part that is replaced is faulty, maintenance personnel should fill in the Offsite Repair Card for Faulty Materials, and send the card and the faulty part to Huawei for timely maintenance.
Page 530
Avoid direct eye exposure to the laser beam launched from the optical interface board or fiber. NO TICE ● Before replacing the chassis, contact Huawei engineers to see if a license is required. You can apply for a license or use Stick License to activate some license control items.
Page 532
NO TICE ● To ensure valid part replacement, when replacing the control board, contact Huawei engineers to determine whether a license needs to be applied for. You can apply for a license or use Stick License to activate some license control items.
Page 533
This requirement is to ensure that the replacement control board can work properly. If a spare control board's version is later than a control board to be replaced, contact Huawei technical support to determine whether this spare control board can be used and to obtain replacement guidance.
Page 535
NO TICE ● To ensure valid part replacement, when replacing the control board, contact Huawei engineers to determine whether a license needs to be applied for. You can apply for a license or use Stick License to activate some license control items.
Page 536
This requirement is to ensure that the replacement control board can work properly. If a spare control board's version is later than a control board to be replaced, contact Huawei technical support to determine whether this spare control board can be used and to obtain replacement guidance.
Page 537
After replacing a part, collect the tools. If the part is faulty, maintenance personnel should fill in the Offsite Repair Card for Faulty Materials, and send the card and the faulty part to Huawei for timely maintenance. 4.1.2.5 Replacing the PIC Board Impact on the System Replacing the PIC board will interrupt services for about three to five minutes.
Page 539
After replacing a part, collect the tools. If the part is faulty, maintenance personnel should fill in the Offsite Repair Card for Faulty Materials, and send the card and the faulty part to Huawei for timely maintenance. Issue 05 (2023-03-31)
Page 541
After replacing a part, collect the tools. If the part is faulty, maintenance personnel should fill in the Offsite Repair Card for Faulty Materials, and send the card and the faulty part to Huawei for timely maintenance. 4.1.2.7 Replacing the FAN Board Impact on the System If the FAN board has to be replaced, replace it quickly.
Page 542
After replacing a part, collect the tools. If the part is faulty, maintenance personnel should fill in the Offsite Repair Card for Faulty Materials, and send the card and the faulty part to Huawei for timely maintenance. 4.1.2.8 Replacing the Optical Module...
Page 547
After replacing a part, collect the tools. If the part is faulty, maintenance personnel should fill in the Offsite Repair Card for Faulty Materials, and send the card and the faulty part to Huawei for timely maintenance. Issue 05 (2023-03-31)