Preparing for Setup
Use the supplied RJ-45-to-DB-9 adapter cable to insert the RJ-45 connector into the console port on the
Step 2
switch rear panel, as shown in
Figure D-2
3
Attach the DB-9 female DTE of the adapter cable to a PC serial port, or attach an appropriate adapter to
Step 3
the terminal.
Wait before you power on the switch.
Step 4
1 Catalyst 3560 switch
2 Power cord
Step 5
Before you power on the switch, start the terminal emulation session to see the output from the power-on
self-test (POST). The terminal-emulation software—frequently a PC application such as Hyperterminal
or ProcommPlus—makes communication between the switch and your PC or terminal possible.
Configure the baud rate and character format of the PC or terminal to match these console port default
Step 6
characteristics:
9600 baud
•
8 data bits
•
1 stop bit
•
No parity
•
•
None (flow control)
Step 7
Connect one end of the supplied AC power cord to the power connector on a switch rear panel. See
Figure
Step 8
Connect the other end of the power cable to a grounded AC outlet.
Catalyst 3560 Switch Hardware Installation Guide
D-2
Figure
Connecting a Switch to a PC
CO NS OL
E
RA TIN
G
100 -20
0V ~
5.0 A-2
.5A , 50-
60 HZ
3
D-2.
Appendix D
Configuring the Switch with the CLI-Based Setup Program
D-2.
1
DC INP
UT S FO
R RE MO
PO WE
TE
R SU PP
SP EC IFI
LY
ED IN
+12 v
MA NU
@7 .5A
AL
-48
@7 .8A
2
RJ-45-to-DB-9 adapter cable
OL-6337-07