Document Conventions
Cisco 12006 and Cisco 12406 Router Installation and Configuration Guide
xiv
Route Processor (GRP), Performance Route Processor (PRP), clock and
scheduler cards (CSC), switch fabric cards (SFC), and alarm cards, and gives
a functional overview.
Chapter 2, "Preparing for
•
for power, environmental safety, cabling, rack-mounting, electrostatic
discharge (ESD), unpacking, site log, and site preparation checklist.
Chapter 3, "Installing the
•
installation and setup of Cisco 12006 and Cisco 12406 Routers.
•
Chapter 4, "Troubleshooting the
solve problems that might occur during installation.
Chapter 5, "Field Diagnostics for the Cisco 12000 Series
•
Router"—Describes how to load and run the field diagnostics for the
Cisco 12000 Series Internet Router.
Chapter 6, "Maintaining the
•
field-replaceable unit (FRU) level, removal and replacement procedures for
field-replaceable units and assemblies, and associated procedures to
troubleshoot and verify FRU and device operation.
•
Chapter A, "Technical
and connector cable specifications for Cisco 12006 and Cisco 12406 Routers.
Index
•
This publication uses the following conventions:
Ctrl- represents the key labeled Control. For example, the key combination
•
Ctrl-z means hold down the Control key while you press the z key.
Command descriptions use these conventions:
Examples that contain system prompts denote interactive sessions, indicating
•
the commands that you should enter at the prompt. The system prompt
indicates the current level of the EXEC command interpreter.
Installation"—Discusses safety, site requirements
Router"—Gives the procedures for the initial
Installation"—Explains how to identify and
Router"—Explains safety at the
Specifications"—Provides the technical specifications
OL-11497-03