Installing and Configuring Route Switch
Processors and Supervisor Engines
This chapter describes how to install and configure a route switch processor or supervisor engine. It also
provides instructions for connecting to the console and uplink ports on the module.
This chapter contains the following sections:
•
•
•
•
•
•
•
•
•
•
•
•
Preparing for Installation or Removal
Before you attempt to install a supervisor engine or route switch processor in the router, be sure to:
•
•
•
•
OL-10100-11
Review the safety precautions and electrostatic discharge guidelines in the
Module Installation and Removal" section on page 3-2
Damage" section on page
Make sure you have on hand the tools required for the installation. (See the
Module Installation" section on page
Determine which chassis slot to install the module in. (See the
section on page
3-3.)
Consider cabling for the console and uplink ports. (See
Specifications.")
Cisco 7600 Series Router Supervisor Engine and Route Switch Processor Guide
C H A P T E R
3-2.
3-3.)
3
"Safety Precautions for
and the
"Preventing Electrostatic Discharge
"Tools Required for
"Determining Module Location"
Appendix B, "Cable and Connector
3-1