Contact and Site Information
Table F-1
Planning Activity
Power evaluation:
•
•
•
•
•
•
•
Grounding evaluation:
•
Cable and interface equipment evaluation:
•
•
•
•
EMI evaluation:
•
•
•
Contact and Site Information
Use the following worksheet
Table F-2
Contact person
Contact phone
Contact e-mail
Building/site name
Data center location
Floor location
Address (line 1)
Address (line 2)
City
State
Cisco Nexus 7000 Series Hardware Installation and Reference Guide
F-2
Site Planning Checklist (continued)
Input power type
Power receptacles
Receptacle proximity to the equipment
Dedicated (separate) circuits for power redundancy
UPS for power failures
Grounding: proper gauge wire and lugs
Circuit breaker size
Data center ground
Cable type
Connector type
Cable distance limitations
Interface equipment (transceivers)
Distance limitations for signaling
Site wiring
RFI levels
(Table
Contact and Site Information
Appendix F
F-2) to record contact and site information.
Site Preparation and Maintenance Records
Verification Time and Date
OL-23069-07