Catalyst 2960-S Switch Getting Started Guide
Powering Guidelines
OL-19793-02
This is an example of a redundant stack cable connection using both the 0.5- and
3-meter FlexStack cables.
Consider these guidelines before you power the switches in a stack:
If you want a particular switch to become the stack master, power on that
•
switch first. This switch becomes the stack master and remains the stack
master until a master reelection is required. After 2 minutes, power on the
remaining switches in the stack.
Power off a switch before you add it to or remove it from an existing switch
•
stack.
For more information on stack master elections, see the "Managing Switch
Stacks" chapter in the switch software configuration guide on Cisco.com.
Catalyst 2960-S Switch Getting Started Guide
17