hit counter script

Cisco Catalyst 2960-S Started Manual page 5

Switch getting
Hide thumbs Also See for Catalyst 2960-S:
Table of Contents

Advertisement

Catalyst 2960-S Switch Getting Started Guide
Step 3
Power the switch by connecting the AC power
cord to the switch power supply and to a
grounded AC outlet.
RAT ING
100- 240~
12-6 A, 50-6
0Hz
Approximately 30 seconds after the switch
powers on, it begins the power-on self-test
(POST), which can take several minutes to
complete.
During POST, the SYSTEM LED blinks
green, and the RPS, STATUS, DUPLEX, and
SPEED LEDs turn solid green.
When POST is complete, the SYSTEM LED
remains solid green, and the other LEDs go
off. The exception is the STACKMASTER
LED, which remains solid green if the switch
is stackable and is acting as stack master.
Before proceeding to the next step, wait until
POST is complete. This might take up
to 5 minutes after the switch is powered on.
Troubleshooting:
If the SYSTEM LED blinks green, does not turn
solid green, or turns amber, contact your Cisco
representative or reseller. The switch failed the
power-on self-test (POST).
Catalyst 2960-S Switch Getting Started Guide
5
OL-19793-02

Advertisement

Table of Contents
loading

Table of Contents