hit counter script

Removing Screws From The Switch - Cisco Catalyst 3750 Hardware Installation Manual

Hide thumbs Also See for Catalyst 3750:
Table of Contents

Advertisement

Chapter 2
Switch Installation
To install the switch in a 19-inch or 24-inch rack (24-inch racks require optional mounting hardware),
follow the instructions described in these procedures:
Installing the switch in a 24-inch rack requires an optional bracket kit not included with the switch. You
Note
can order a kit containing the 24-inch rack-mounting brackets and hardware from Cisco. For the
Catalyst 3750G-24TS switches, order part number RCKMNT-3550-1.5RU=. For the other Catalyst 3750
switches, order part number RCKMNT-1RU=.
The Catalyst 3750G-24WS-S25 and the 3750G-24WS-S50 switches do not support 24-inch
rack-mounting.

Removing Screws from the Switch

If you plan to install the switch in a rack, you must first remove screws in the switch chassis so that
mounting brackets can be attached.
chassis screws in a 1-rack-unit (RU) switch.
1.5-RU switch.
Figure 2-9
16
OL-6336-06
Removing Screws from the Switch, page 2-13
Attaching Brackets to the Catalyst 3750G-24TS Switch, page 2-15
Attaching Brackets to the Catalyst 3750G Integrated Wireless LAN Controller Switches, page 2-18
Attaching Brackets to All Other Catalyst 3750 Switches, page 2-19
Mounting the Switch in a Rack, page 2-26
Attaching the Cable Guide, page 2-28
Figure 2-13
shows how to remove the chassis screws in a 2-RU switch.
Removing Screws from the Catalyst 3750-24TS, 3750G-24T, 3750-24PS, 3750-48PS,
3750G-16TD, and 3750-48TS Switches
17
18
19
20
21
22
C at al ys t
23
24
3 7 5 0
SE RI ES
23X
1
24X
2
Figure
2-9,
Figure
2-10, and
Figure 2-12
shows how to remove the chassis screws in a
Catalyst 3750 Switch Hardware Installation Guide
Installing the Switch
Figure 2-11
show how to remove the
2-13

Advertisement

Table of Contents
loading

Table of Contents