Chapter 2
Switch Installation
Figure 2-37
1
Phillips machine screws
After the switch is mounted in the rack, you might need to perform these tasks to complete the
installation, run the setup program, and access the switch:
(Optional) Connect the switches in the stacks. See the
•
Ports" section on page
Power on the switch. See the
•
stacked, see the
considerations.
Connect to a 10/100 or 10/100/1000 port and run Express Setup. See the Catalyst 3750 Switch
•
Getting Started Guide for instructions.
Connect to the front-panel ports. See the
•
on page 2-41
installation.
For configuration instructions about using the CLI setup program, go to
Switch with the CLI-Based Setup Program."
To use the CLI, enter commands at the Switch> prompt through the console port by using a terminal
program or through the network by using Telnet. For configuration information, see the switch software
configuration guide or the switch command reference.
OL-6336-06
Mounting the Catalyst 3750G-24WS-S25 and 3750G-24WS-S50 Switches in a Rack
SYST
RPS
MAS TR
ST A T
DUP LX
SPEE D
ST ACK
1
2
3
PoE
4
1X
5
6
2X
1
2-32.
"Planning Considerations" section on page 2-9
and the
"Connecting to an SFP Module" section on page 2-43
Ca tal yst
37 50 G
Wi rel ess
SER IES
Po E-2 4
LA N Co
ntr oll er
7
8
9
10
11
12
11X
13
14
15
16
13X
17
18
19
20
21
22
23
24
23X
12X
14X
25
24X
"Connecting StackWise Cable to StackWise
"Verifying Switch Operation" section on page
"Connecting to the 10/100 and 10/100/1000 Ports" section
Catalyst 3750 Switch Hardware Installation Guide
Installing the Switch
26
2-7. If the switches are
for information on powering
to complete the
Appendix D, "Configuring the
2-27