hit counter script

IBM SAN192C-6 Installation, Service And User Manual page 77

Hide thumbs Also See for SAN192C-6:
Table of Contents

Advertisement

Warning : Only trained and qualified personnel should be allowed to install, replace, or service
this equipment.
Note : Before you install, operate, or service the system, see the IBM Systems Safety Notices for
important safety information.
Use this procedure to install the switch on top of the rack-mount support brackets.
Procedure
1. Verify that the rack-mount support brackets are level and securely attached to the rack-mounting rails,
the support rack-mount support brace is securely attached to the brackets, and the rack is stabilized.
2. Slide a mechanical lift under the switch and lift the switch up onto the rack-mount support brackets,
ensuring it is squarely positioned.
3. Attach the switch to the rack-mounting rails. See the "Required Equipment" on page 49.
CAUTION : We recommend grounding the chassis, even if the rack is already grounded. There
is a grounding pad with two threaded M4 holes on the chassis for attaching a grounding lug.
Installing the Switch on the Shelf Brackets
This section provides general instructions for installing the switch on top of the shelf brackets.
About this task
For detailed information about the items required for installation, see the "Required Equipment" on page
49.
The IBM c-type SAN Director Shelf Bracket Kit can be used to support the switch in a non-threaded rack.
This shelf bracket kit can be used as a permanent support when installing a IBM c-type SAN Director in a
rack that meets the requirements listed in the "Rack Requirements" on page 45.
Warning : This unit is intended for installation in restricted access areas. A restricted access area
can be accessed only by using a special tool, lock and key, or other means of security.
Warning : Only trained and qualified personnel should be allowed to install, replace, or service
this equipment.
Note : Before you install, operate, or service the system, see the IBM Systems Safety Notices for
important safety information.
Use this procedure to install the switch on top of the shelf brackets.
Procedure
1. Verify that the shelf brackets are level and securely attached to the rack-mounting rails, the crossbar is
securely attached to the shelf brackets, and the rack is stabilized.
2. Slide the switch onto the shelf brackets, ensuring that it is squarely positioned.
3. Attach the IBM c-type SAN director switch to the rack-mounting rails.
a) Slide the clip nuts over the holes on the non threaded rails on the rack. These clip nuts provide the
threading for the screws that will secure the chassis to the rack.
b) Use the 12 10-32 x 1/2 inch screws provided in this shelf bracket kit to secure the chassis to the
rack. See "Required Equipment" on page 49.
CAUTION : We recommend that grounding the chassis, even if the rack is already grounded.
There is a grounding pad with two threaded M4 holes on the chassis for attaching a grounding
lug.
Chapter 2. Rack Installation  51

Advertisement

Table of Contents
loading

This manual is also suitable for:

San384c-6San768c-6

Table of Contents