Chapter 3
Installing the Cisco 10008 Router
Figure 3-9
Step 5
Attach the cable management bracket to the bottom of the chassis
Note
Step 6
Check that all
Go to the
Step 7
Non-Rack Installation
The chassis should already be in the area where you will install it. If you have not determined where to
install your chassis, see the
information about site considerations.
OL-0659-13
Attaching the Cable Management Bracket
FAN S
FAN
OK
MU LTI-
FAI LUR
E
FAN
FAI LUR
E
1
2
3
CIS CO
100 00
CIS CO
CIS CO
100 00
100 00
PO WE R
FA UL T
MI SW IRE
PO WE R
FA UL T
MI SW IRE
The cable management bracket consists of two pieces (the cable guide and channel), and is
shipped assembled. If you want to use the cable guide only, you can remove the channel by
loosening the captive screws before attaching the cable guide to the chassis.
–
Ejector levers are in the closed position.
Chassis mounting screws are tight.
–
PRE and line card captive screws are tight.
–
"Connecting the Chassis to Ground" section on page 3-13
"Receiving the Cisco 10000 Series Router" section on page 2-14
CA UTI
Wh en hot
ON
swa ppin
rem ova
l and rep
g this fan
be don
lace me
tray ,
e in und
sys tem
er two
nt mu st
shu tdo
min ute
wn will
s or
occ ur.
4
0A
PR OC
ES SO R
0B
ON LY
5
CIS CO
6
7
100 00
CIS CO
8
100 00
CIS CO
100 00
CIS CO
CIS CO
100 00
CIS CO
100 00
CIS CO
100 00
100 00
PR OC
ES SO R
ON LY
Cisco 10008 Router Hardware Installation Guide
Non-Rack Installation
(Figure
3-9).
to continue the installation.
for
3-11