hit counter script

Verifying Switch Operation; Installing The Switch - Cisco Catalyst 2960 Hardware Installation Manual

Hide thumbs Also See for Catalyst 2960:
Table of Contents

Advertisement

Chapter 2
Switch Installation (24- and 48-Port Switches)

Verifying Switch Operation

Before you install the switch in a rack, on a wall, or on a table or shelf, you should power on the switch
and verify that the switch passes POST.
If your configuration has an RPS, connect the switch and the RPS to the same AC power source. See
Chapter 3, "Switch Installation (8-Port Switches),"
information.
When you connect the RPS to the switch, put the RPS in standby mode. Set the RPS to active mode
Note
during normal operation.
To power on the switch, connect one end of the AC power cord to the AC power connector on the switch,
and connect the other end of the power cord to an AC power outlet.
Attach only the following Cisco RPS model to the RPS receptacle:
Warning
PWR-RPS2300, PWR675-AC-RPS-N1=. Statement 370
As the switch powers on, it begins the POST, a series of tests that runs automatically to ensure that the
switch functions properly. LEDs can blink during the test. POST lasts approximately 1 minute. When
the switch begins POST, the System, RPS, Status, Duplex, and Speed LEDs turn green. The System LED
blinks green, and the other LEDs remain solid green.
When the POST completes successfully, the System LED remains green. The RPS LED remains green
for some time and then reflects the switch operating status. The other LEDs turn off and then reflect the
switch operating status. If a switch fails POST, the System LED turns amber.
POST failures are usually fatal. Call Cisco technical support representative if your switch fails POST.
After a successful POST, disconnect the power cord from the switch. Install the switch in a rack, on a
wall, on a table, or on a shelf as described in the

Installing the Switch

This section applies to all switches except the Catalyst 2960-8TC-L, Catalyst 2960G-8TC-L, and
Catalyst 2960PD-8TT-L switches. For information applicable to those switches, see
Installation (8-Port Switches)."
This section describes these installation procedures:
OL-7075-05
Rack-Mounting, page 2-8
Wall-Mounting, page 2-12
Table- or Shelf-Mounting, page 2-15
and see the Cisco RPS documentation for more
"Installing the Switch" section on page
Catalyst 2960 Switch Hardware Installation Guide
Installing the Switch
2-7.
Chapter 3, "Switch
2-7

Advertisement

Table of Contents
loading

Table of Contents