hit counter script

Desk- Or Shelf-Mounting (With Mounting Screws) - Cisco Catalyst 2960 Hardware Installation Manual

Hide thumbs Also See for Catalyst 2960:
Table of Contents

Advertisement

Chapter 3
Switch Installation (8-Port Switches)
Step 2
Remove the four rubber feet from the adhesive strip, and attach them to the recessed areas on the bottom
of the unit. This prevents the switch from sliding on the desk or shelf.
Note
Step 3
Place the switch on the desk or shelf.
Note
After the switch is mounted on the desk or shelf, do these tasks to complete the installation:
1.
2.
3.
For configuration instructions about using the command-line interface (CLI) setup program, go to
Appendix C, "Configuring the Switch with the CLI-Based Setup Program."

Desk- or Shelf-Mounting (with Mounting Screws)

This section is specific to the Catalyst 2960 8-port switches. For information applicable to the other
Catalyst 2960 switches, see
The switch can be secured to a desk or shelf with mounting screws. Follow these steps:
Locate the screw template. You can use the template to align the mounting screw holes and also as a
Step 1
guide to make sure that you install the screws into the desk or shelf with proper clearance.
Position the screw template on top of the desk or shelf so that the two side-by-side slots face the front of
Step 2
the desk or shelf, as shown in
shelf after the switch is installed.
Note
OL-7075-05
We strongly recommend that you attach the rubber feet. Doing so helps prevent airflow
restriction and overheating.
We strongly recommend that you allow at least 3 inches (7.6 cm) of clearance around the
ventilation openings to prevent airflow restriction and overheating.
Do not stack switches or place switches side-by-side unless they are separated on all sides by at
least 3 inches (7.6 cm) of clearance from each other.
Do not place any items on the top of the switch.
Power on the switch. See the
Connect to a 10/100 or 10/100/1000 port, and run Express Setup. See the switch getting started guide
for instructions.
Connect to the front-panel ports. See the
on page
2-18, the
"Connecting to SFP Modules" section on page
Dual-Purpose Port" section on page 2-22
Chapter 2, "Switch Installation (24- and 48-Port Switches)."
Figure
Wait before you attach the screw template to the desk or shelf.
"Verifying Switch Operation" section on page
"Connecting to the 10/100 and 10/100/1000 Ports" section
to complete the installation.
3-1. This ensures that the power cord faces the rear of the desk or
Catalyst 2960 Switch Hardware Installation Guide
Installing the Switch
3-6.
2-19, and the
"Connecting to a
3-7

Advertisement

Table of Contents
loading

Table of Contents