Chapter 3
Switch Installation (8-Port Switches)
Figure 3-2
1
2
After the switch is mounted on the desk or shelf, do these tasks to complete the installation:
1.
2.
3.
For configuration instructions about using the CLI setup program, go to
Switch with the CLI-Based Setup Program."
Under the Desk- or Shelf-Mounting (with Mounting Screws)
This section is specific to the Catalyst 2960 8-port switches. For information applicable to the other
Catalyst 2960 switches, see
Follow these steps to install the switch under a desk or shelf:
Locate the screw template. The template is used to align the mounting screw holes and is also used as a
Step 1
guide to make sure the screws are installed under the desk or shelf with proper clearance.
Position the screw template underneath the desk or shelf so that the two side-by-side slots face the front
Step 2
of the desk or shelf, as shown in
or shelf after the switch is installed.
Peel the adhesive strip off the bottom of the screw template, and attach it to the underside of the desk or
Step 3
shelf.
OL-7075-05
Mounting the Switch on Top of a Desk or Shelf
SYS T
STA T
CO NS OL
DPL X
E
1x
SPD
2x
3x
4x
5x
MO DE
1
Slides on this way 3
Desk or shelf
Screws
Power on the switch. See the
Connect to a 10/100 or 10/100/1000 port, and run Express Setup. See the switch getting started guide
for instructions.
Connect to the front-panel ports. See the
on page
2-18, the
"Connecting to SFP Modules" section on page
Dual-Purpose Port" section on page 2-22
Chapter 2, "Switch Installation (24- and 48-Port Switches)."
6x
7x
C a t a l y
8x
s t 2 9 6
0
S
eri es
1
2
"Verifying Switch Operation" section on page
"Connecting to the 10/100 and 10/100/1000 Ports" section
to complete the installation.
Figure
3-3. This ensures that the power cord faces the rear of the desk
Catalyst 2960 Switch Hardware Installation Guide
Installing the Switch
3
3-6.
2-19, and the
"Connecting to a
Appendix C, "Configuring the
3-9