hit counter script

Cisco Catalyst 2960 Hardware Installation Manual page 67

Hide thumbs Also See for Catalyst 2960:
Table of Contents

Advertisement

Chapter 3
Switch Installation (8-Port Switches)
Figure 3-4
1
Desk or shelf
2
Screws
After the switch is mounted under the desk or shelf, do these tasks to complete the installation:
Power on the switch. See the
1.
Connect to a 10/100 or 10/100/1000 port, and run Express Setup. See the switch getting started guide
2.
for instructions.
Connect to the front-panel ports. See the
3.
on page
Dual-Purpose Port" section on page 2-22
For configuration instructions about using the CLI setup program, go to
Switch with the CLI-Based Setup Program."
OL-7075-05
Mounting the Switch Under a Desk or Shelf
1
2
3
3
Slides on this way
"Verifying Switch Operation" section on page
2-18, the
"Connecting to SFP Modules" section on page
"Connecting to the 10/100 and 10/100/1000 Ports" section
2-19, and the
to complete the installation.
Catalyst 2960 Switch Hardware Installation Guide
Installing the Switch
3-6.
"Connecting to a
Appendix C, "Configuring the
3-11

Advertisement

Table of Contents
loading

Table of Contents