Installing the Switch
Figure 3-1
1
Screw template 3
2
Screws
Peel the adhesive strip off the bottom of the screw template, and attach it to the top of the desk or shelf.
Step 3
Use a 0.144-inch (3.7 mm) or a #27 drill bit to drill a 1/2-inch (12.7 mm) hole in the three screw
Step 4
template slots.
Insert three screws in the slots on the screw template, and tighten them until they touch the top of the
Step 5
screw template.
Remove the screw template from the desk or shelf.
Step 6
Place the switch onto the mounting screws, and slide the switch forward until it locks in place, as shown
Step 7
in
Figure
Note
Catalyst 2960 Switch Hardware Installation Guide
3-8
Installing the Mounting Screws on Top of a Desk or Shelf
3
Desk or shelf
3-2.
We strongly recommend that you allow at least 3 inches (7.6 cm) of clearance around the
ventilation openings to prevent airflow restriction and overheating.
Do not stack switches or place switches side-by-side unless they are separated on all sides with
at least 3 inches (7.6 cm) of clearance from each other.
Do not place any items on the top of the switch.
2
1
Chapter 3
Switch Installation (8-Port Switches)
OL-7075-05