Chapter 2
Switch Installation
Figure 2-10
Slide the ground screw through the ring terminal.
Step 4
Insert the ground screw into the functional ground screw opening on the front panel.
Step 5
Use a ratcheting torque screwdriver to tighten the ground screw and ring terminal lug to the switch front
Step 6
panel to 8.5 in-lb. The torque should not exceed 8.5 in-lb (0.9 Nm). See
Figure 2-11
1
Ground cable with ring terminal lug
Attach the other end of the ground wire to a grounded bare metal surface, such as a ground bus, a
Step 7
grounded DIN rail, or a grounded bare rack.
Crimping the Ring Terminal
Attaching the Ground-Lug Screw
1
Figure
Cisco IE 3000 Switch Hardware Installation Guide
Verifying Switch Operation
2-11.
2-17