hit counter script

Cisco Catalyst 2955 Hardware Installation Manual page 78

Cisco systems switch installation guide
Hide thumbs Also See for Catalyst 2955:
Table of Contents

Advertisement

Verifying Switch Operation
The Catalyst 2955 switch can be used with an optional AC/DC power converter
Note
(PWR-2955-AC=) in a nonhazardous location installation.
For instructions on how to connect the power converter to the switch, see the
"Connecting the Switch to the Power Converter" section on page
Locate the power and relay connector, the ferrite, and the switch installation
protective liner in the switch kit.
You can get replacement power and relay connectors (PWR-2955-CONNECT=)
Note
by calling Cisco Technical Support. See the
section on page
Obtain these necessary tools and equipment:
Catalyst 2955 Hardware Installation Guide
3-14
xxx.
Ratcheting torque flathead screwdriver that exerts up to 15 inch pounds
(in-lbs.) of pressure
Ring terminal lug (such as Thomas & Bett part number RC10-14 or
equivalent)
Crimping tool (such as Thomas & Bett part number WT2000, ERG-2001, or
equivalent)
10- to 12-gauge copper ground wire (such as Belden part number 9912 or
equivalent)
Wire for power connections:
For input AC power connections to the power converter, use a standard
18-gauge AC power cord. See the
section on page 3-35
cord for use with the power converter.
For DC power connections, use UL and CSA rated, style 1007 or 1569
twisted-pair copper appliance wiring material (AWM) wire (such as
Belden part number 9318).
Wire-stripping tools for stripping 10- to 12- and 18-gauge wires
"Obtaining Technical Assistance"
"Preparing the AC Power Cord"
for instructions on how to prepare an AC power
Chapter 3
Installation
3-29.
78-14944-03

Advertisement

Table of Contents
loading

Table of Contents

Save PDF