Installing the Cisco VG310 and Cisco VG320 Voice Gateways
What You Need to Know
Slot and Port Numbers
Cisco VG310 and Cisco VG320 have built in ports and slots to accommodate modules and interface cards
that include the Enhanced High-Speed WAN Interface Card (EHWIC) and the Packet Voice and Data Module
(PVDM3). For information on slot and port numbering, see
Before You Begin
Read the
VG320.
Unpacking and Inspecting
Do not unpack the voice gateway until you are ready to install it. If the installation site is not ready, keep the
chassis in its shipping container to prevent accidental damage.
The voice gateway, cables, printed publications, and any optional equipment you ordered might be shipped
in more than one container. When you unpack each shipping container, check the packing list to ensure that
you have received all the following items:
• The Cisco VG310 or Cisco VG320 Analog Voice Gateway
• Power cord, 6 foot (1.8 m)
• RJ-45-to-DB-25 adapter cable (labeled Console)
• RJ-45-to-DB-9 adapter cable (labeled Auxiliary)
• Rack-mounting brackets for 19-inch rack (one pair) with screws for attaching to chassis
• Chassis guard for wall-mounting applications
• Grounding lug and fasteners
Inspect all items for shipping damage. If anything appears damaged, or if you encounter problems when
installing or configuring your system, contact Cisco customer service representative. (See
Assistance, on page
Mounting the Chassis
There are three methods of installing the chassis:
•
•
•
OL-31292-01
Safety Recommendations, on page 13
xi.)
Mounting the Chassis on a Rack
Mounting the Chassis on a Wall, on page 30
Installing the Voice Gateway on a Bench, on page 33
Interfaces and Service
before installing and connecting Cisco VG310 or Cisco
Cisco VG310 and Cisco VG320 Voice Gateways Hardware Installation Guide
What You Need to Know
Capabilities.
Obtaining Technical
27