hit counter script

Replacement Of Measurement System Battery Pack - ABB IRB 1600 - 5/1,2 type A Product Manual

Articulated robot
Hide thumbs Also See for IRB 1600 - 5/1,2 type A:
Table of Contents

Advertisement

3.4.4. Replacement of measurement system battery pack

Location of battery pack
The battery pack for the measurement system is located inside the base of the robot, as shown
in the figure below.
xx0500001390
A
Battery pack on serial measurement unit
The battery pack is attached to the serial measurement unit as shown in the figure below.
xx0500001393
A
B
C
3HAC026660-001 Revision: C
3.4.4. Replacement of measurement system battery pack
Base cover, including gasket. Battery pack is located beneath the cover.
Battery pack
Velcro strap
Connector X3
3 Maintenance
Continues on next page
103

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Irb 1600 - 7/1,45 type aIrb 1600 - 8/1,2 type aIrb 1600 - 8/1,45 type aIrb 1600idIrb 1600 - 5/1,45 type aIrb 1600 - 6/1,2 type a ... Show all

Table of Contents