hit counter script

Chapter 2 Part Names - Mitsubishi Electric NZ2GF-CCB User Manual

Cc-link ie field network-cc-link bridge module
Table of Contents

Advertisement

CHAPTER 2
This chapter describes the part names of a bridge module.
No.
Name
1)
POWER LED (green)
RUN LED (green)
MODE LED (green)
CC-Link IE Field
2)
Network LED
D LINK LED (green)
ERR. LED (red)
P1
L ER LED (red)
3)
LINK LED (green)
P2
L ER LED (red)
LINK LED (green)
PART NAMES
11)
1)
5)
3)
8)
Indicates the power supply status of the bridge module.
ON: Power supply on
OFF: Power supply off
Indicates the status of CC-Link IE Field Network.
Indicates the operating status of the bridge module.
ON: Operating normally
OFF: A serious error has occurred.
Indicates the mode of the bridge module.
ON: In the online mode
Flashing: In the unit test mode
OFF: Unit test completed
Indicates the data link status.
ON: Performing data link (cyclic transmission in progress)
Flashing: Performing data link (cyclic transmission stopped)
OFF: Not performing data link (disconnected)
Indicates the error status of CC-Link IE Field Network of the bridge module.
ON: A moderate error or serious error has occurred.
Flashing: A warning has occurred.
OFF: Operating normally
PORT1 connector for connecting CC-Link IE Field Network. (RJ45 connector)
Connect an Ethernet cable. ( Page 46, Section 6.4.2)
There are no restrictions on the connecting order of the "P1" connector and "P2" connector.
ON:
• The module has received abnormal data.
• The module is performing loopback.
OFF:
• The module has received normal data.
• The module has not performed loopback.
ON: Linkup in progress.
OFF: Linkdown in progress.
PORT2 connector for connecting CC-Link IE Field Network. (RJ45 connector)
Connect an Ethernet cable. ( Page 46, Section 6.4.2)
There are no restrictions on the connecting order of the "P1" connector and "P2" connector.
(Same as the LEDs of the "P1" connector)
2)
6)
7)
4)
10)
9)
Description

CHAPTER 2 PART NAMES

17
2

Advertisement

Table of Contents
loading

Table of Contents