hit counter script

Setting Using The Engineering Tool - Mitsubishi Electric NZ2GF-CCB User Manual

Cc-link ie field network-cc-link bridge module
Table of Contents

Advertisement

7.2.2

Setting using the engineering tool

Follow the procedures below to set CC-Link.
1.
Writing the parameters of CC-Link remote stations using the engineering tool
Set the parameters of CC-Link remote stations by CC-Link parameter setting using the engineering tool.
( Page 59, Section 7.2.2 (1))
2.
Checking the status of communications
Execute a line test in CC-Link to check the communication status. ( Page 64, Section 7.2.3)
● There are restrictions on the version of the bridge module to use CC-Link parameter setting using the engineering tool.
( Page 132, Appendix 4)
● Do not power off or reset the power supply of the bridge module during parameter writing. Doing so may delete the
parameters set in the bridge module.
● During parameter writing, the transmission delay time may extend (3s maximum) or data link may stop.
(1) Writing the parameters of CC-Link remote stations
The parameters of the CC-Link remote station can be set from the engineering tool by connecting the
engineering tool to the master station connected to the bridge module.
Engineering tool
Master/local module
CC-Link IE Field Network
CC-Link IE Field Network slave stations
Remote I/O station Remote I/O station Remote device station Remote I/O station Remote device station
CHAPTER 7 VARIOUS SETTINGS
Startup mode switch
Set the startup mode
switch to PRM.
Bridge module
CC-Link
Target CC-Link remote
stations of parameter
settings
7
59

Advertisement

Table of Contents
loading

Table of Contents