Installation and Removal of the TCC Cards
Verifying the Status of the TCC Card
To check the status of the module, do the following:
Step 1
Ensure that the POWER LED illuminates green (module operational).
Step 2
When the switch is online, use the show module command to verify that the system acknowledges the
new module and that the module's status is good.
Step 3
If the module is not operational, re-seat it. If the module is still not operational, contact your customer
service representative.
Removing the TCC Card
Caution
During this procedure, wear grounding wrist-straps to avoid ESD damage to the card. Do not directly
touch the backplane with your hand or any metal tool. This could result in an electric shock.
Caution
To prevent ESD damage, handle the TCC card by the carrier edges only.
To remove a TCC card from a Cisco RFGW-10 UEQAM, do the following:
Step 1
Disconnect the network interface cables attached to the ports on the TCC card that you intend to remove.
Step 2
Loosen the captive installation screws (see
Figure 5-12
1
Step 3
Grasp the top and bottom ejector levers and simultaneously pivot the levers outward to release the TCC
card from the backplane connector.
Cisco RF Gateway 10 Hardware Installation Guide
5-22
Captive Installation Screws and Ejector Levers
2
Captive installation screw
Figure
5-12).
1
2
Ejector Lever
Figure 5-12
shows a close-up of the bottom ejector lever.
Chapter 5
Installing and Removing FRUs
OL-16264-04