hit counter script

Cisco RFGW-10 Hardware Installation Manual page 152

Rf gateway 10
Hide thumbs Also See for RFGW-10:
Table of Contents

Advertisement

Installing or Replacing the Cables in the UCH2
Figure 6-10
Step 3
Remove the ESD cap from a cable (see
UCH2. (See
cable.
Figure 6-11
Figure 6-12
Step 4
Insert and wiggle the connector into the hole.
Cisco RF Gateway 10 Hardware Installation Guide
6-12
Using a Screwdriver to Slide Open the Lock Bar on the UCH2
Figure
6-13.) Use
Table 6-3
Removing an ESD Cap from an MCX Connector
Removing an ESD Cap from an F Connector
Chapter 6
Figure 6-11
and
Figure
6-12) and place it in the hole in the
to determine the correct color and location for each colored
Cabling the Cisco RFGW-10 UEQAM
OL-16264-04

Advertisement

Table of Contents
loading

Table of Contents