hit counter script

Cisco RFGW-10 Hardware Installation Manual page 93

Rf gateway 10
Hide thumbs Also See for RFGW-10:
Table of Contents

Advertisement

Chapter 3
Cisco RFGW-10 UEQAM Installation
Step 2
Ensure that the DC PEM is disconnected from the chassis midplane power connector and that the power
supply breaker is in the off position.
Step 3
Locate the stud on the DC PEM for the GND connection, which must be connected first and follow these
steps:
a.
Using the provided grounding lug in the accessory kit, replace the washers and Kepnut screw in the
following order:
b.
Tighten the Kepnut screws on the power supply studs to the recommended torque of 18 in-lbs
minimum to 22 in-lbs maximum.
Figure 3-19
1
2
3
4
1 DC PEM captive screws
2 DC PEM On (|) /Off (O) switch
3 Earth grounding symbol
4 DC PEM earth ground lug
OL-16264-04
Washer
Grounding cable lug
Kepnut screw
Cisco RFGW-10 DC PEM
Connecting Power to Cisco RFGW-10 UEQAM
8
5 Fan
6 DC PEM handle
7 DC PEM LEDs
8 DC PEM terminal and plastic cover
Cisco RF Gateway 10 Hardware Installation Guide
5
6
7
1
3-25

Advertisement

Table of Contents
loading

Table of Contents