hit counter script

Tools And Equipment; Unpacking And Verifying Shipping Contents - Cisco RFGW-10 Hardware Installation Manual

Rf gateway 10
Hide thumbs Also See for RFGW-10:
Table of Contents

Advertisement

Chapter 2
Preparing Your Site for Installation

Tools and Equipment

The tools and equipment listed below are recommended as the minimum necessary to install the
Cisco RFGW-10 UEQAM. You may need additional tools and equipment to install associated equipment
and cables. You may also require test equipment to check electronic and optical signal levels, power
levels, and communications links.

Unpacking and Verifying Shipping Contents

When you receive your chassis, perform the following steps and use the shipping contents checklist from
the next section:
Step 1
Inspect the box for any shipping damage. (If there is damage contact your service representative).
Step 2
Unpack the Cisco RFGW-10 UEQAM.
OL-16264-04
¼-inch flat-head screwdriver (for UCH2 cable holder installation onto the RF Switch Cards)
3/16-inch flat blade screwdriver
Number 2 Phillips screwdrivers to tighten the captive installation screws on most systems
Antistatic mat, bags, or antistatic foam for you to remove modules
10-mm socket wrench for tightening DC power and ground connection nuts
4 AWG (21mm^2) wire for DC power and ground connections (customer provided)
6 AWG (13mm^2) wire for NEBS Chassis ground connection (customer provided)
Wire stripper and crimping tool for preparing the DC power and ground connections (the accessory
kit comes with specific 4 AWG and 6 AWG 90-degree ground lugs)
Heat shrink tubing or electrical insulation for exposed DC power and ground crimp joints
12 universal cable holders UCH2 (supplied in the accessory kit)
T-10 TORX driver tool
Tape measure (optional)
Level (optional)
MCX terminated cable bundle (optional)
Rack-mount kit (provided in the accessory kit)
Ten #4 AWG wire, 90 degree, dual ring lugs, 0.63 spacing for M6 studs (reference Panduit
LCD4-14AF-L, provided in the accessory kit for DC PEM power and ground connections)
One #6 AWG wire, 90 degree, dual ring lugs, 0.63 spacing for M5 studs (reference Panduit
LCD6-10AF-L, provided in the accessory kit for NEBS chassis ground connection)
Two M5 pan-head Phillips screws (provided in the accessory kit for NEBS chassis ground
connection)
Eight rack-mounting screws (customer provided)
Connectors and wire for the DC circuit or circuits
Cables—75-ohm quad-shielded precision miniature video cable, bonded foil 1855 type (reference
YR50386 and YR52310)
Wrist-strap or other grounding device
<does this require a change?>
Cisco RF Gateway 10 Hardware Installation Guide
Tools and Equipment
2-19

Advertisement

Table of Contents
loading

Table of Contents