hit counter script

Front Panel Led - Cisco RFGW-10 Hardware Installation Manual

Rf gateway 10
Hide thumbs Also See for RFGW-10:
Table of Contents

Advertisement

Chapter 1
Overview
Feature
CONSOLE port
10/100/1000 MGT port
LINK LED
1G/10G UPLINKS
(SFP/SFP+) ports
Uplink port LEDs

Front Panel LED

Table 1-9
LED
STATUS
ACTIVE SUP
UTILIZATION
OL-16264-04
Description
This is a 10/100/1000 port that uses an RJ-45 connector. The console port allows you
access the switch either locally (with a console terminal) has an RJ-45 connector. The
console port allows you to perform the following functions:
Configure the switch from the CLI
Monitor network statistics and errors
Configure SNMP agent parameters
The Ethernet management port is a Layer 3 host port to which you can connect a PC.
You can use the Ethernet management port instead of the console port for network man-
agement.
Note
When connecting a PC to the Ethernet management port, you must assign an IP
address.
The 10/100/1000 MGT port has a link LED associated with it. See
The Supervisor Engine 7-E has four 1-G or 10-G ports that use either SFP transceivers
or SFP+ transceivers.
Each of the four uplink ports has two LEDs associated with it. One LED displays port
status when a 1-GB SFP transceiver is installed in the port socket. The second LED
displays uplink port status when a 10-GB SFP+ transceiver is installed in the port socket.
See
Table
1-9.
Cisco RFGW-10 Supervisor Engine 7-E Front Panel LEDs
Color and Meaning
The STATUS LED indicates the status of he supervisor engine.
Green—All diagnostic tests have passed
Orange—System boot or a diagnostic test is in progress.
Red—A diagnostic test failed.
Off—The supervisor engine is disabled or is not powered up.
Indicates whether the supervisor engine is active or standby.
Green—Supervisor engine is active (in redundant supervisor engine
configurations)
Off—Supervisor engine is in standby mode (in redundant supervisor
engine configurations)
When the switch is operational, the eight utilization LEDs indicate the current
traffic load over the backplane as an approximate percentage value. Each LED
lit green indicates approximately 12.5 percent of load.
Cisco RF Gateway 10 Hardware Installation Guide
Cisco RFGW-10 Components
Table
1-9.
1-19

Advertisement

Table of Contents
loading

Table of Contents