hit counter script

Mitsubishi Electric QJ71GF11-T2 User Manual page 77

Melsec-q series cc-link ie field network master/ local module
Table of Contents

Advertisement

Remark
The test status and result can be viewed through monitoring the link special relays (SBs) on GX Works2.
Item
When completed
When failed
• Loop test completion status (SB0094): ON
• Loop test normal/abnormal end (SB0095): OFF
• Loop test completion status (SB0094): ON
• Loop test normal/abnormal end (SB0095): ON
CHAPTER 6 INSTALLATION AND WIRING
Description
6
75

Advertisement

Table of Contents
loading

Table of Contents