When channels are divided as following:
Ex.
• CH1 and CH2: Group 1
• CH3 and CH4: Group 2
CH□ Operation monitor
CH1 Simultaneous temperature rise status (RX24)
CH2 Simultaneous temperature rise status (RX25)
CH3 Simultaneous temperature rise status (RX26)
CH4 Simultaneous temperature rise status (RX27)
*2
This becomes Simultaneous temperature rise in process (1) when the temperature rise starts; however, it becomes
Simultaneous temperature rise not in process (0) before the temperature rise starts.
● When using the simultaneous temperature rise function, turn on CH Operation request flag (RY11 to RY14) for the
corresponding channels simultaneously.
● When the simultaneous temperature rise function is used, the setting change rate limiter cannot be used. (Page 324,
Appendix 3 (12))
● When the operating status is changed from stop to run during a simultaneous temperature rise, the simultaneous
temperature rise function stops working and CH Auto tuning status (RX20 to RX23) turns off. (No error occurs.)
200
Temperature process value (PV)
CH1 Set value (SV)
CH2 Set value (SV)
CH3 Set value (SV)
CH4 Set value (SV)
OFF
(RX11 to RX14)
*2
and
0
*2
*2
0
and
*2
Temperature rise start point
ON
1
1
Controlled by the temperature control module
Temperature rise completion
times are matched in each group.
Group 1
Group 2
arrival point
arrival point
0
0
Time