hit counter script

Mitsubishi Electric NZ2GF2B-60TCTT4 User Manual page 244

Cc-link ie field network temperature control module
Table of Contents

Advertisement

(6) Programming and writing data
1.
Create the following programs with GX Works2 depending on the functions used.
Page 242, Section 9.3.1 (6) (a)
2.
Write the program to the CPU module of the master station and reset the CPU module, or turn off
and on the power supply.
3.
Change the state of the CPU module of the master station to RUN.
(a) Program examples
• Common program
*1
Add the following MCR instruction to the end of the program.
• Operation shift program for CH1 to CH3
• Program that reads the temperature process value (PV) and takes action when a process alarm or a rate
alarm occurs
242
RESET
or
Turn off and on the power.
RUN
CH2 Processing of when a process alarm occurs
CH3 Processing of when a rate alarm occurs
Check the data link status of the
station No.1 (NZ2GF2B-60TCTT4).
CH1 Operation shift
CH2 Operation shift
CH3 Operation shift
Transfer CH1 Temperature process value
(PV) to D2008.
Transfer CH2 Temperature process value
(PV) to D2009.
Transfer CH3 Temperature process value
(PV) to D2010.
Transfer CH2 Alert definition to D2005.
Transfer CH3 Alert definition to D2006.
*1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nz2gf2b-60tcrt4

Table of Contents