hit counter script

Mitsubishi Electric MELSEC-L LD75P User Manual page 492

Positioning module
Hide thumbs Also See for MELSEC-L LD75P:
Table of Contents

Advertisement

(3) When the "JOG start signal" is turned ON again during deceleration caused by
the ON  OFF of the "JOG start signal"
When the "JOG start signal" is turned ON again during deceleration caused by the ON  OFF of the "JOG start
signal", the JOG operation will be carried out from the time the "JOG start signal" is turned ON.
Forward run JOG start
signal [Y8, YA, YC, YE]
BUSY signal
[XC, XD, XE, XF]
(4) When "JOG start signal" is turned ON while the test function of GX Works2 is
used
When the "JOG start signal" is turned ON while the test function is used, it will be ignored and the JOG operation
will not be carried out.
Md.1
In test mode flag
Forward run JOG
start signal
[Y8, YA, YC, YE]
490
ON
OFF
ON
OFF
JOG operation not possible
JOG operation not
because this is not the
possible because the
rising edge of the JOG
test function is being
start signal
used
ON
ON
OFF
Forward run JOG operation
OFF
t
Forward run JOG
operation execution
t

Advertisement

Table of Contents
loading

This manual is also suitable for:

Melsec-l ld75d

Table of Contents